The Cessna 180 panel
The Cessna 180 panel
Home / Instrument Rating

Your instrument checkride, flown the way you trained.

Instrument Rating, airplane, in Erie, Colorado or Kenai, Alaska. Know the aircraft requirements and the EFB rules before you go, and book it in a few minutes.

1 to 4 weekstypical time to an exam date
No deposit72 hours' notice to cancel
6 airportsFront Range and Kenai, AK
$50 offveterans, military, law enforcement
Before you book

What Sarah looks for.

An airplane that can't fly the required approaches is one of the most common reasons an instrument exam can't go ahead. Check yours before you book.

Have these ready

  • An aircraft equipped for the instrument approaches the ACS requires
  • A view-limiting device, and instrument covers if you'll need them
  • Charts and references downloaded and current, plus a backup device
  • Knowledge test results and your instructor's endorsements
  • IACRA complete and signed by your recommending instructor

The full checklist → · Print it (PDF)

Where, and in what

Mainly at Erie, Colorado (KEIK), with Longmont, Broomfield and Colorado Air and Space Port on request, and year-round in Kenai and Soldotna, Alaska.

Bring the registration and airworthiness certificate to the briefing room with the aircraft logbooks, required inspections tabbed. Digital copies or photocopies are fine.

Colorado → · Alaska → · Sarah's aircraft →

On exam day

Five phases, in this order.

Knowing them takes most of the nerves out of the day.

  1. 01Arrive and brief

    Every document comes to the briefing room, including the airplane's.

  2. 02Paperwork

    ID, certificates, endorsements, logbooks and IACRA, reviewed together.

  3. 03Oral

    Tailored to your experience and your knowledge-test misses.

  4. 04Flight

    The ACS tasks for your rating, with the tools you normally use.

  5. 05Debrief

    Pass, and you leave with your temporary certificate.

Questions

Good to know.

Can I use my EFB?

Yes. All equipment in the airplane may be used, but you may be evaluated on system failures and malfunctions as the ACS describes. If your EFB fails and required tasks can't be evaluated, the result is unsatisfactory, so bring a backup.

Where does the scenario come from?

When you schedule, you'll get an email with your scenario. Plan it with real-world winds before you arrive.

How far ahead should I book?

Most exams are booked 1 to 4 weeks out. Priority goes to applicants already signed off in IACRA.

What if the weather doesn't cooperate?

Sarah generally doesn't charge to discontinue for weather. If she traveled to your airport, the travel fee still applies.

Can I cancel or reschedule?

Yes. There's no deposit, and Sarah asks for 72 hours' notice to cancel.

Ready for your Instrument checkride?

Send your request and Sarah will reply by email with a date and what to send.

Email info@fullthrottleaviationllc.com · Call or text (832) 510-4673
ExamsRequest an exam